亚洲欧美日韩在线精品一区二区-亚洲欧美日韩在线观看二区-亚洲欧美日韩在线不卡-亚洲欧美日韩在线播放-亚洲欧美日韩在线2020-亚洲欧美日韩一区高清中文字幕

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當(dāng)前位置:

首頁 News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
主站蜘蛛池模板: 私人毛片免费高清影视院| 久草6| 少妇把腿扒开让我添| 欧美另类丰满69xxxxx| 4455亚洲| 欧洲极品少妇| 国产中文欧美日韩在线| 免费毛片在线看片免费丝瓜视频| 欧美熟妇色ⅹxxx欧美妇| 国产欧美久久一区二区| 国产精品爽爽久久久久久蜜臀| 亚洲avtv永久综合在线| 色播五月激情| 国产免国产免费| 美女下面小内内的沟| 精品国产亚洲av麻豆| 97色爱| 亚洲精品国偷拍自产在线麻豆| 亚洲色婷婷综合开心网| 区二区三区玖玖玖| haodiaose在线精品免费观看| 扒开腿狂躁女人爽出白浆| 亚洲中文字幕精品久久久久久直播| 丰满少妇人妻无码| 99精品久久久中文字幕| 在线免费视频一区二区| 国产日产精品一区二区三区四区的特点| 骚五月| 闺蜜张开腿让我爽了一夜| 亚洲avav天堂av在线网毛片| 国产婷婷色一区二区三区| 久久国产成人精品av| 人人干日日操| 在线a视频网站| 久久久久久亚洲精品| 深爱激情站| 午夜精品久久久久久| 精品国产一区二区三区不卡| 成人a大片高清在线观看| 樱桃视频影视在线观看免费| 中文无遮挡h肉视频在线观看|