亚洲欧美日韩在线精品一区二区-亚洲欧美日韩在线观看二区-亚洲欧美日韩在线不卡-亚洲欧美日韩在线播放-亚洲欧美日韩在线2020-亚洲欧美日韩一区高清中文字幕

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當(dāng)前位置:

首頁 News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
主站蜘蛛池模板: 日韩精品无码一区二区三区| 九色九九九老阿姨| 一个人看的www免费视频在线观看| 精品人妻av区波多野结衣| 俺也来国产精品欧美在线观看| 欧洲肉欲k8播放毛片| 天天玩天天操| 亚洲精品乱码久久久久久| 午夜操操操| 久久国产精品波多野结衣av| 国产粉嫩高中无套进入| 久久久久麻豆v国产精华液好用吗| 天天爽夜夜爱| 色女人在线| 亚洲av色影在线| 男人的天堂av社区在线| 久久精品一区二区三区av | 婷婷丁香五| 中文字幕乱码人妻综合二区三区| 亚洲精品天堂无码中文字幕| 又大又长粗又爽又黄少妇视频 | 精品香蕉一区二区三区| 天天操综合视频| 国产精品久久久久一区二区三区 | 欧美天堂视频| 亚洲视频一区| 久久婷婷五月综合色精品| 男人免费看片| 久久精品一区二区免费播放| 农村乱人伦一区二区| 黄色免费网站在线| 99久久婷婷国产综合精品电影| 欧美性性性性性色大片免费的| 国产爽视频| 欧美a级情欲片在线观看免费| 全国最大成人网| 国产精品国产三级国产av品爱网| 日韩欧美国产电影| 国产香蕉视频在线播放| 亚洲av无码精品色午夜蛋壳| 亚洲乱人伦中文字幕无码|